Selling Your Warehouse Racking: What to Expect

Start Early

Racking is usually the last thing handled in a move and the most likely to hold up handing back the building. Bring in a buyer early.

What a Buyer Needs From You

  1. PhotosWide shots of the rows, close-ups of an upright and a beam connector.
  2. A rough countRows, bays per row, levels per bay. Or uprights and beams.
  3. Your dateWhen the building has to be empty.
  4. AccessDock doors, floor level, working hours, whether the building is still operating.
  5. The lease termsWhether anchors must be removed and the floor patched.

How the Process Goes

  • Offer. From photos for a small lot, a walk-through for a full building.
  • Schedule. Planned around your move-out date and any stock still in the rack.
  • Teardown. Rack emptied first, then dismantled, banded and staged.
  • Trucking. Flatbeds loaded as the rack comes down.
  • Handover. Anchors handled per the lease, floor swept, you get paid as agreed.

What Makes It Go Smoothly

  • Empty the rack first. Product left on it is the top cause of delay.
  • One company for everything. Buyer, crew and trucks.
  • Insurance in hand. Your landlord will ask for a certificate.
  • One point of contact. Someone on your side who can decide on site.

A Word on Timing

A full distribution center takes real time to clear; a few rows can go in a day. Give the buyer your date up front.

Tell us what you have and when you need it gone.